{"id":1630,"date":"2014-02-04T17:34:05","date_gmt":"2014-02-04T22:34:05","guid":{"rendered":"https:\/\/immex.ca\/?p=1630"},"modified":"2014-02-07T17:38:39","modified_gmt":"2014-02-07T22:38:39","slug":"brp-will-move-future-complexe-le-baron","status":"publish","type":"post","link":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/","title":{"rendered":"BRP will move into the future Complexe Le Baron"},"content":{"rendered":"<p>Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex by 2016.<\/p>\n<p><a href=\"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1482\" alt=\"ev13-015-bat1et2-montage-1-modifie (1024x374)\" src=\"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg\" width=\"500\" height=\"182\" srcset=\"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg 300w, https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374.jpg 1024w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><br \/>The estimated $30 million project includes the construction of two buildings with a total area of \u200b\u200b150,000 square feet and has approximately 720 parking spaces; 550 exterior and 170 interior.<\/p>\n<p>Five site accesses were planned; one on Don Bosco Street South, and two on Marconi Street and King Street West.<\/p>\n<p>The construction of the first building will begin in March and the completion is scheduled for October 2014. This first building is approximately 40,000 square feet on three floors.<\/p>\n<p>Energie Cardio and Chez Cora, who are tenants of the current Complexe Le Baron, will move into the first building.<\/p>\n<p>BRP will install its training room on the lower floor of the first building near the Magog River. A space of 10,000 square feet remains vacant in this first building.<\/p>\n<p>Construction of the second building with a total area of \u200b\u200bapproximately 110,000 square feet over five floors, will start in the fall of 2014 and the completion is scheduled for late 2015 or early 2016.<\/p>\n<p>BRP will occupy two of the five floors of the building located along King Street West.<\/p>\n<p>A terrace is planned on the fifth floor which is still vacant, just like the second floor.<\/p>\n<p>For more information, <a style=\"line-height: 1.8em;\" href=\"http:\/\/www.lapresse.ca\/la-tribune\/sherbrooke\/201402\/04\/01-4735672-brp-demenagera-dans-le-futur-complexe-le-baron.php\" target=\"_blank\">please see the article in La Tribune<\/a><span style=\"line-height: 1.8em;\">.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex by 2016. The estimated $30 million project includes the construction of&hellip; <a href=\"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/\" class=\"more-link\">Continue Reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":6396,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[85],"tags":[],"class_list":["post-1630","post","type-post","status-publish","format-standard","hentry","category-real-estate-project"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BRP will move into the future Complexe Le Baron - Immex Soci\u00e9t\u00e9 Immobili\u00e8re<\/title>\n<meta name=\"description\" content=\"Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BRP will move into the future Complexe Le Baron - Immex Soci\u00e9t\u00e9 Immobili\u00e8re\" \/>\n<meta property=\"og:description\" content=\"Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex\" \/>\n<meta property=\"og:url\" content=\"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/\" \/>\n<meta property=\"og:site_name\" content=\"Immex Soci\u00e9t\u00e9 Immobili\u00e8re\" \/>\n<meta property=\"article:published_time\" content=\"2014-02-04T22:34:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2014-02-07T22:38:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg\" \/>\n<meta name=\"author\" content=\"Genevi\u00e8ve Therrien\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Genevi\u00e8ve Therrien\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/\"},\"author\":{\"name\":\"Genevi\u00e8ve Therrien\",\"@id\":\"https:\\\/\\\/immex.ca\\\/#\\\/schema\\\/person\\\/f2b752a3c6db6bf4e19dcab651f4fb88\"},\"headline\":\"BRP will move into the future Complexe Le Baron\",\"datePublished\":\"2014-02-04T22:34:05+00:00\",\"dateModified\":\"2014-02-07T22:38:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/\"},\"wordCount\":234,\"image\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/immex.ca\\\/wp-content\\\/uploads\\\/2014\\\/02\\\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg\",\"articleSection\":[\"Real Estate Project\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/\",\"url\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/\",\"name\":\"BRP will move into the future Complexe Le Baron - Immex Soci\u00e9t\u00e9 Immobili\u00e8re\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/immex.ca\\\/wp-content\\\/uploads\\\/2014\\\/02\\\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg\",\"datePublished\":\"2014-02-04T22:34:05+00:00\",\"dateModified\":\"2014-02-07T22:38:39+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/#\\\/schema\\\/person\\\/f2b752a3c6db6bf4e19dcab651f4fb88\"},\"description\":\"Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/#primaryimage\",\"url\":\"https:\\\/\\\/immex.ca\\\/wp-content\\\/uploads\\\/2014\\\/02\\\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg\",\"contentUrl\":\"https:\\\/\\\/immex.ca\\\/wp-content\\\/uploads\\\/2014\\\/02\\\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/immex.ca\\\/en\\\/brp-will-move-future-complexe-le-baron\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/immex.ca\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BRP will move into the future Complexe Le Baron\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/immex.ca\\\/#website\",\"url\":\"https:\\\/\\\/immex.ca\\\/\",\"name\":\"Immex Soci\u00e9t\u00e9 Immobili\u00e8re\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/immex.ca\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/immex.ca\\\/#\\\/schema\\\/person\\\/f2b752a3c6db6bf4e19dcab651f4fb88\",\"name\":\"Genevi\u00e8ve Therrien\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BRP will move into the future Complexe Le Baron - Immex Soci\u00e9t\u00e9 Immobili\u00e8re","description":"Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/","og_locale":"en_US","og_type":"article","og_title":"BRP will move into the future Complexe Le Baron - Immex Soci\u00e9t\u00e9 Immobili\u00e8re","og_description":"Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex","og_url":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/","og_site_name":"Immex Soci\u00e9t\u00e9 Immobili\u00e8re","article_published_time":"2014-02-04T22:34:05+00:00","article_modified_time":"2014-02-07T22:38:39+00:00","og_image":[{"url":"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg","type":"","width":"","height":""}],"author":"Genevi\u00e8ve Therrien","twitter_misc":{"Written by":"Genevi\u00e8ve Therrien","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/#article","isPartOf":{"@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/"},"author":{"name":"Genevi\u00e8ve Therrien","@id":"https:\/\/immex.ca\/#\/schema\/person\/f2b752a3c6db6bf4e19dcab651f4fb88"},"headline":"BRP will move into the future Complexe Le Baron","datePublished":"2014-02-04T22:34:05+00:00","dateModified":"2014-02-07T22:38:39+00:00","mainEntityOfPage":{"@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/"},"wordCount":234,"image":{"@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/#primaryimage"},"thumbnailUrl":"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg","articleSection":["Real Estate Project"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/","url":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/","name":"BRP will move into the future Complexe Le Baron - Immex Soci\u00e9t\u00e9 Immobili\u00e8re","isPartOf":{"@id":"https:\/\/immex.ca\/#website"},"primaryImageOfPage":{"@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/#primaryimage"},"image":{"@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/#primaryimage"},"thumbnailUrl":"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg","datePublished":"2014-02-04T22:34:05+00:00","dateModified":"2014-02-07T22:38:39+00:00","author":{"@id":"https:\/\/immex.ca\/#\/schema\/person\/f2b752a3c6db6bf4e19dcab651f4fb88"},"description":"Plans for the new Complexe Le Baron were unveiled by Immex who also confirmed that it has signed a lease with BRP to relocate its offices in the complex","breadcrumb":{"@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/#primaryimage","url":"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg","contentUrl":"https:\/\/immex.ca\/wp-content\/uploads\/2014\/02\/ev13-015-bat1et2-montage-1-modifie-1024x374-300x109.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/immex.ca\/en\/brp-will-move-future-complexe-le-baron\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/immex.ca\/en\/"},{"@type":"ListItem","position":2,"name":"BRP will move into the future Complexe Le Baron"}]},{"@type":"WebSite","@id":"https:\/\/immex.ca\/#website","url":"https:\/\/immex.ca\/","name":"Immex Soci\u00e9t\u00e9 Immobili\u00e8re","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/immex.ca\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/immex.ca\/#\/schema\/person\/f2b752a3c6db6bf4e19dcab651f4fb88","name":"Genevi\u00e8ve Therrien"}]}},"_links":{"self":[{"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/posts\/1630","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/users\/6396"}],"replies":[{"embeddable":true,"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/comments?post=1630"}],"version-history":[{"count":0,"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/posts\/1630\/revisions"}],"wp:attachment":[{"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/media?parent=1630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/categories?post=1630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/immex.ca\/en\/wp-json\/wp\/v2\/tags?post=1630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}